Quantcast
Channel: Avid Community
Viewing all articles
Browse latest Browse all 47506

multigroups and different frame rates

$
0
0

I've got footage of different frame rates, I'm AMA linking and transcoding them into their respective projects (by frame rate). Then copying the transcoded clips into the main proj (which is 23.98). But then I want to multigroup the transcoded clips so I don't have a thousand clips that are 10 - 30 seconds long (and so I can match back to the group). This works fine with the 23.98 material but when I group the 29.97 material I can't load the multigroup into the source monitor. Does anyone know any way around this that allows me to relink back via AMA at the end?

Thank you.


Viewing all articles
Browse latest Browse all 47506

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>