Quantcast
Channel: Avid Community
Viewing all articles
Browse latest Browse all 47506

23.97 in a 29.97 project/timeline

$
0
0

DS11.1
23.97 HD clips in an SD timeline
I haven't had to do this in a while and I'm unable to get it working. 
I've obviously forgotten something since the last time I had to do it :-)
What I thought I did last time...
3.2 contract container clip in timeline
toolbar 3.2 expand. This results in out of sync audio.
Can someone give me a step by step

The project is 4.3 SD with HD 23.98 insert shots
project/sequence 4.3 SD 29.97
media is linked mxf from MC7

Thanks
K

 

 


Viewing all articles
Browse latest Browse all 47506

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>